“We Are Tired of Being Treated as Second-Class Citizens”: Tudun Wada Residence Decry Poor Power Supply

By Palang Paul

In a community renowned for determining political fortunes, residents are now fighting a fundamental loss: light. For over five years, the Tudun Wada area of Jos has been held hostage by an epileptic power supply so catastrophic that youth leaders have branded it a “disgraceful and demonic” failure of governance.

Tudun Wada Youth leader addressing the crowd:Photo by Palang Paul.

This crisis, which has crippled businesses and forced students to study in darkness, has now spurred a final, uncompromising ultimatum to the Jos Electricity Distribution Company (JED) and government authorities, with a peaceful protest scheduled for January 20, 2026.

The declaration by the Tudun Wada Youth Leadership directly challenges the performance and silence of the JED, framing the blackout not as an inconvenience but as a “direct assault on the economic, educational, and social well-being” of thousands. Their outrage underscores a bitter irony noted in their press statement: “It is a known fact across Plateau State that Tudun-Wada community is famous for generating revenue and even deciding political votes. But yet, deprived of basic amenities from those in authority after election.”

A COMMUNITY CRIPPLED BY DARKNESS

The youth leadership’s account details a community pushed to the edge. Businesses have been “crippled literally,” security risks have surged due to perpetually dark streets, and families are spending “hard earned income on fuel instead of food.” For student and business owner alike, the situation has moved beyond frustration to sheer survival.

Tudun Wada Residence at JED office expressing their dissatisfaction. Photo by Palang Paul.

At the heart of their fury are pointed, unanswered questions that accuse JED of either “deliberate neglect” or “outright incompetence.” They demand to know why other parts of Jos enjoy better supply while Tudun Wada languishes, why JED has offered no explanations or timelines, and most painfully, “why must residents pay full bills for half baked services?”

BROKEN PROMISES AND A FINAL STAND

The community’s patience was finally exhausted following what they describe as a broken agreement. Youth Forum Secretary General, Hon. Kefas Nanbal Dagin (Macarthy), cited a signed assurance from authorities that power would be restored—a promise that never materialized. This failure has transformed resignation into resolve.

Comrade Marcathy Tudun Wada Youth Secretary protesting together with the Masses. Photo Credit Palang Paul.

Their demands, issued as “devoid of negotiations,” are specific and urgent: immediate mass installation of prepaid meters, instant restoration of steady power, a full technical audit of the infrastructure, and an emergency stakeholders’ meeting within seven days. The warning accompanying these demands is unambiguous: “THE PATIENCE OF TUDUN WADA COMMUNITY IS NOT UNLIMITED.”

OFFICIAL SILENCE AND PLEDGED ESCALATION

Backed by voices like Chief Kefiano Kefas Ropshik (Kefiano), who condemned the “glaring disparity” as “indefensible and unsustainable,” the leadership has outlined a clear path of escalation. While committed to starting with a peaceful protest, they vow to employ mass protests, a complete boycott of JED services, legal action, and petitions to national regulators if their demands are ignored.

Tudun Wada Residence at the Protest ground. Photo Credit: Palang Paul.

“We will not be intimidated, and we will not back down,” their statement reads, signaling a new chapter of assertive activism from a voter-rich community that feels betrayed. As Tudun Wada prepares to march, their battle cry illuminates a deeper truth: their power as kingmakers is now being wielded not at the ballot box, but in the streets, fighting for the most basic dignity of reliable electricity.

Post Comment